Wednesday, November 18, 2026 · 11:45 AM – 12:45 PM
Add to calendarAbstract:
Freight trucks make up only a small fraction of U.S. vehicles but produce a large share of transportation greenhouse gas emissions. Adopting electric trucks would reduce emissions and local air pollution, but the high-power charging required would often demand upgrades to electric distribution grids near truck stops, warehouses, and factories — particularly to the substations that form the critical interface between distribution and transmission grids. These upgrade projects can take as much as 3-9 years and cost millions, while fleet operators can acquire electric trucks and build charging facilities in under a year. This timing asymmetry creates a structural bottleneck: fleet operators and charge point operators (CPOs) cannot confidently electrify without grid capacity, yet grid operators cannot confidently invest without evidence of charging demand. The result is a self-reinforcing deadlock. To contribute to breaking this deadlock, this dissertation explores ways that i) CPOs can reduce the grid capacity required for truck charging and ii) grid operators can plan ahead for charging in the face of substantial uncertainty about electric truck adoption.
Y2E2 Building 473 Via Ortega, Stanford, CA 94305 Room 292A
Wednesday, November 18, 2026 · 11:45 AM – 12:45 PM